Since established in 1993, we experienced rapid growth in both our company structure and business results. The following timeline shows our evolvement from a small business to a worldwide corporation through continual expansion and diversification.
|
1993
|
Jiawei set up in Shenzhen
|
|
1996
|
The First factory
in Shenzhen for manufacture of small
solar panels and solar
garden light
|
|
2000
|
Jiawei Solarchina
launched in Hong Kong
|
|
2002
|
Cooperation with former
Astropower (currently GE Energy)
The 1st UL qualified OEM module exported
to USA
|
|
2003
|
Installation of 130
KW large solar integration project
in Tibet
The largest project in China in 2003
|
|
2004
|
Module production
line enlarged to 15MW/yr for GE Energy
Started co-operation with SunPower
for OEM products
Established Solar Energy Research
Center with Zhongshan University in
Guangzhou
|
|
2005
|
Developed monocrystalline
Si solar cell line in Wuhan factory,
10MW/yr
Established Jiawei Solar Energy Research
Centre with Wuhan University in Wuhan
Jiawei, capacity reached to 45MW.
|
|
2006
|
The third factory
set up in Wuhan for module production
with multicrystalline solar cells
from Evergreen Solar
The fourth factory set up in Shenzhen
New factory for GE module production
line expanded and relocated
Jiawei capacity reached to 90MW.
|
|
2007
|
Set up silicon feedstock
Factory in Beijing
Expand new facility in Wuhan for solar
cell line of 30 MW
Co-operation with the Centre of Renewable
Energy The University of ?Hong Kong
for promotion of PV systems
Jiawei capacity expanded to120 MW
|
| 2008 |
Wuhan facility
expanded with capacity of module line
35MW, cell line 25MW
Jiawei total capacity reached 150MW |
| 2009 |
Jiawei's
own ingot & wafer facility launched
in Beijing |
|